Franke Consumer Products FDB 9078 SIL-K Installation, Drilling the Wall and Fixing the Brackets

Models: FDB 9078 SIL-K

1 14
Download 14 pages 20.96 Kb
Page 6
Image 6
INSTALLATION

INSTALLATION

Drilling the Wall and Fixing the Brackets

15

1÷2

7.2.1 X

11

116

116

 

12a

67

 

280

280

650 mm min

 

565

Draw the following on the Wall:

a Vertical line up to the ceiling or top surface, at the centre of the area in which the Hood is to be fitted;

a Horizontal line: 650 mm min. above the Cooker Top.

Rest the Bracket 7.2.1 as indicated, 1-2 mm from the ceiling or surface above the hood, aligning its cen- tre (grooves) with the vertical reference line.

Mark the centres of the holes in the bracket.

Rest the Bracket 7.2.1 as indicated, X mm under the first bracket (X = height of the Upper chimney provided), aligning its centre (grooves) with the vertical reference line.

Mark the centres of the holes in the bracket.

As shown in the drawing, mark a reference point 116 mm from the vertical reference line, and 565 mm above the horizontal reference line.

As shown in the drawing, mark a reference point 280 mm from the vertical reference line, and 67 mm above the horizontal reference line.

Repeat this operation on the other side.

N.B. Should installation of the lower bracket 7.2.1 interfere in any way with that of the hood canopy, the lower bracket 7.2.1 may be omitted.

Drill the points marked using a ø 8 mm drill bit.

Insert the plugs 11 into the holes.

Fix the lower bracket 7.2.1, if it is to be fitted, using the screws 12a (4.2 x 44.4 ) provided.

Fix the upper bracket 7.2.1 and the bracket supporting connection 15 together, using the 2 screws 12a (4.2 x 44.4 ) provided.

Tighten the 2 screws 12a (4.2 x 44.4) provided in the hood canopy fixing bores, leaving a gap of 5-6 mm between the wall and the heads of the screws.

EN

 

6

 

6

Page 6
Image 6
Franke Consumer Products FDB 9078 SIL-K manual Installation, Drilling the Wall and Fixing the Brackets