Recirculation version air outlet
• | Fix the connection 15 to the frame using the 4 screws pro- | 15 |
| vided. |
|
• | Fix the flange 10 to the lower opening of the connection 15. |
|
•Connect the hood air outlet to the flange in the lower part of 10 the junction using a rigid or flexible ø 150 tube (by installer’s choice).
Flue assembly - Mounting the hood body | 12c |
|
•Position the upper chimney section and fix the upper part to the frame using the 2 screws 12c (2,9 x 6,5) provided.
• Similarly, position the lower chimney section and fix the lower part to the frame using the 2 screws 12c (2,9 x 6,5) pro- vided.
12c
Before fixing the hood body to the frame:
• Remove the grease filters from the hood body.
• Remove any activated charcoal filters.
12f
•From below, use the 4 screws 12f (M6 x 10)provided to fix the hood body to the frame.
| ELECTRICAL CONNECTION |
|
• | Connect the hood to the mains through a | 24 |
| ing a contact gap of at least 3 mm. | 12e |
• | Remove the grease filters (see paragraph Maintenance) being | |
| sure that the connector of the feeding cable is correctly inserted |
|
| in the socket placed on the side of the fan. |
|
• Connect the control connector Cmd. |
| |
• Connect the lights connector Lux. |
| |
• | Place the connectors in the junction box 24 and close it using | 12c |
|
|
the 2 screws 12e (2,9 x 9,5) provided.
•Fix the junction box to the hood body using the 2 screws 12c (2,9 x 6,5) provided.
•For the recirculation version, fit the activated carbon odour fil- ter.
•Replace the grease filters.
Lux
Cmd
EN |
| 2 |
| 20 |