Chassis Installation

920-024-05 (12-04)

Chassis Installation

STEP 1

Slide the chassis into the cabinet stopping approximately 3" from full insertion. Stuff the chassis seal gasket (Item #14) one

 

inch deep between the chassis and the cabinet (See Figure P). Begin at either bottom corner and go up the side, across the

 

top, and down the opposite side. Make sure that the gasket is behind the conduit connector (furthest from you). Push the

 

chassis into the shell the remaining distance so that the plastic front shrouds the front edge of the shell. Fasten the junction

 

box mounting foot to the shell with the sheet metal screw.

 

If chassis seal gasket is not installed, the operation of the unit will be negatively affected. Also, the operation noise and

 

outside noise will be amplified.

NOTE:

Field wiring must be provided to this junction box in accordance with NATIONAL ELECTRIC CODE ARTICLE 501.

 

Field and equipment grounds are to be terminated at the post in the junction box with the green screw provided. Equipment

 

power leads are to be connected with the field supply by means of wire nuts (not provided). Install the gasket and cover

 

plate onto the junction box.

Figure P

CHASSIS SEAL GASKET