COMPONENTS

TEST PROCEDURE

 

 

RESULTS

 

 

 

 

 

 

 

 

 

 

 

RELAY 2

Check for continuity of relay 2 with an

 

POWER

 

 

 

 

ohm-meter.

 

 

 

 

 

 

LEVEL

 

 

 

 

(Remove wire leads from relay 2 and

 

 

 

 

 

 

 

 

 

 

 

operate the unit.)

1

4 sec

 

18 sec

 

 

 

 

 

 

 

 

 

 

 

2

6 sec

 

16 sec

 

 

 

 

 

3

8 sec

 

14 sec

 

 

 

 

 

4

10 sec

 

12 sec

 

 

 

 

 

5

12 sec

 

10 sec

 

 

 

 

 

6

14 sec

 

8 sec

 

 

 

 

 

7

16 sec

 

6 sec

 

 

 

 

 

 

 

 

 

 

 

8

18 sec

 

4 sec

 

 

 

 

 

9

20 sec

 

2 sec

 

 

 

 

 

10

22 sec

 

0 sec

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FAN MOTOR

Measure the resistance.

Normal:

 

(Wire leads removed)

(Ohm-meter scale: R x 1)

A:Approx. 85

~ 100 ohm.

 

 

B:Approx. 10

~ 25 ohm.

 

 

Abnormal: Infinite or several

 

 

ohm.

TURNTABLE MOTOR

(Wire leads removed)

Measure the resistance. (Ohm-meter scale: R x 1)

Normal: Approx. 100 ~ 150 ohm

Abnormal: Infinite or several ohm.

NOTE : • A MICROWAVE LEAKAGE TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS SERVICED FOR ANY REASON.

MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.

WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE CONNECTOR, NOT THE WIRES.

5-11

Page 21
Image 21
Frigidaire LCRT2010ST service manual Relay, Power, Level, FAN Motor, Turntable Motor