
Chapter 2 — Getting Started
Installing the 2nd display (for Pro type only)
To install the 2nd display onto the Frontier ULV Terminal, do the following:
1.Connect the DB 15 cable to the connector on the back of the Frontier ULV Terminal LCD screen and arrange the cable in the clamp as shown.
DB 15 connector
Cable clamp
2.Replace the base cover. Connect one end of the DC 12V adapter cable to the base and allow the other end of the cable pass through the hole on the 2nd Display cover stand.
|
|
|
|
|
| DC 12V adapter |
| |
|
|
|
|
|
| cable |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Base |
|
|
|
|
|
|
|
|
|
|
|
|
|
| 2nd Display | ||
| ||||||||
cover |
|
|
|
|
|
| cover stand | |
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.Affix the 2nd Display cover stand to the base with three M3 screws. Next, connect the other end of the DC 12V adapter cable and the DB 15 cable to the 2nd Display.
11