1-2 SPARC Enterprise M4000/M5000 Servers Installation Guide • December 2010
FIGURE1-1 WorkflowRequired for Installation
Checking the cables and environmental conditions.
“Before Installing the Server” on page 2-2
Connecting the console
“Connecting the Administration Console” on page3-5
Powering on the server
“Powering On the Server” on page 3-10
Installing additional peripheral devices
“Connecting Additional Peripheral Devices” on page 3-15
Setting up the network
“Overview of Network Configuration” on page 4-1
Preparation
Installation and
checking the
power supply
Environmental
Setup
Connecting the power cords
“Connecting Input Power Cords” on page 3-2