Index-2 SPARC Enterprise M8000/M9000 Servers Site Planning Guide • April 2008
IInstallation specifications, 1-5
MM8000
appearance, 1-7
floor openings, 1-23
footprint, 1-23
installation area, 1-13
M9000
appearance, 1-9
floor openings, 1-29
footprint, 1-25
installation area, 1-19
NNetwork
configuration, 2-3
specifications, 1-1
system control, 2-3
Network connection
planning, 2-1
setup, 2-2
Ooverview
UPS interface, 2-7
PPhysical specifications, 1-1, 1-2
Power
cabinet, 1-5
circuit breakers, 1-3
facility, 1-3
feed, 1-4
outlets, 1-3
redundancy, 1-4
single-phase, 1-3, 1-5
three-phase, 1-5
Power cable
connection, 3-14, 3-18, 3-20
Power supplies
single-phase, 3-5
three-phase delta, 3-7
three-phase star, 3-8
Power supply
single-phase, 3-4, 3-12
three-phase, 3-4, 3-17
three-phase star, 3-19
RRequirements
environmental, 1-2, 3-1
facility power, 3-12
vibration, 3-4
SSetup
domain, 2-3
platform, 2-3
signal cables, 2-7
Space required
system transport, 1-31
Specifications
air conditioning, 3-8
cooling, 3-8
electrical, 2-1, 3-1, 3-4
environmental, 2-1, 3-1
installation, 1-5
network, 1-1
physical, 1-1, 1-2
size, 1-13
space, 1-13
Stabilization
cabinet, 1-32
System
appearance, 1-7, 1-9
components, 1-1, 1-4
installation space, 1-13
management, 1-1
System transport
space required, 1-31
TTemperature
computer room, 3-3
limits, 3-2
recommended, 3-2
UUPC connector
cable connector, 2-11
definitions of signals, 2-8
electrical specifications, 2-10