GE AGL24 Installation Instructions, Air Conditioner, IMPORTANT - Save these, Before You Begin

Models: AGL24 AGL18 AGW24 AGV24 AGQ24

1 40
Download 40 pages 58.79 Kb
Page 9
Image 9
Installation Instructions

Installation Instructions

Air Conditioner

Air ConditionerQuestions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: www.GEAppliances.com

 BEFORE YOU BEGIN BEFORE YOU BEGIN

Read these instructions completely and carefully.

IMPORTANT Save these

instructions for local inspector’s use.

IMPORTANT Observe all governing codes and ordinances.

Note to Installer – Be sure to leave these instructions with the Consumer.

Note to Consumer – Keep these instructions for future reference.

Skill level – Installation of this appliance requires basic mechanical skills.

Completion time – Approximately 1 hour

We recommend that two people install this product.

Proper installation is the responsibility of the installer.

Product failure due to improper installation is not covered under the Warranty.

•IMPORTANT — Save theseELECTRICAL REQUIREMENTS

Some models require a 115/120-volt a.c., 60 Hz grounded outlet protected with a

15-amp time delay fuse or circuit breaker.

The 3-prong grounding plug minimizes the possibility of electric shock hazard. If the wall outlet you plan to use is only a 2-prong outlet, it is your responsibility to have it replaced with a properly grounded 3-prong wall outlet.

Some models require 230/208-volt a.c., protected with a time delay fuse or circuit breaker. These models should be installed on their own single branch circuit for best performance and to prevent overloading house or apartment wiring circuits, which could cause a possible fire hazard from overheating wires.

ELECTRICAL REQUIREMENTSCAUTION:

Do not, under any circumstances, cut or remove the third (ground) prong from the power cord.

Do not change the plug on the power cord of this air conditioner.

Aluminum house wiring may present special problems—consult a qualified electrician.

TOOLS YOU WILL NEED

Phillips head screwdriver

Flat-blade screwdriver

Pencil

Ruler or tape measure

Level

Scissors or knife

Power cord may include a current interrupter device. A test and reset button is provided on the plug case. The device should be tested on a periodic basis by first pressing the TEST button and then the RESET button. If the TEST button does not trip or if the RESET button will not stay engaged, discontinue use of the air conditioner and contact a qualified service technician.

9

Page 9
Image 9
GE AGL24 Installation Instructions, Air Conditioner, IMPORTANT - Save these, Before You Begin, Electrical Requirements

FAQ

What are the electrical requirements for the air conditioner?

Some models require a 115/120-volt a.c.,60 Hz grounded outlet protected with a 15-amp time delay fuse or circuit breaker. If the wall outlet you plan to use is only a 2-prong outlet, it is your responsibility to have it replaced with a properly grounded 3-prong wall outlet.

What tools will I need for installation?

You will need a Phillips head screwdriver, flat-blade screwdriver, pencil, ruler or tape measure, level, and scissors or knife.

What should I do if the current interrupter device on the power cord is not working?

If the TEST button on the current interrupter device does not trip or if the RESET button will not stay engaged, discontinue use of the air conditioner and contact a qualified service technician.