GE AKS05 Preparing to install the air conditioner, Before You Begin, Electrical Requirements

Models: AKS05 AKV05

1 20
Download 20 pages 21.38 Kb
Page 7
Image 7
Preparing to install the air conditioner.

Preparing to install the air conditioner.

Read these instructions completely and carefully.

Before You Begin

NOTE TO INSTALLER: Leave these instructions with

CAUTION:

the air conditioner after installation is completed.

NOTE TO CONSUMER: Keep this Owner’s Manual

Do not, under any circumstances, cut or remove

and Installation Instructions for future use.

the third (ground) prong from the power cord.

IMPORTANT NOTES:

Do not change the plug on the power cord of this

For personal safety, this air conditioner must be

air conditioner.

 

properly grounded.

Aluminum house wiring may present special

It is important to have the wall outlet and circuit

problems—consult a qualified electrician.

 

checked by a qualified electrician if there is any

 

doubt as to whether a proper ground exists.

 

Follow National Electric Codes (NEC) and/or local

 

codes and ordinances.

 

Electrical Requirements

 

Safety Instructions Operating Instructions Installation

Some models require 115/120-volt ac, 60-Hz grounded outlet protected with a 15-amp time-delay fuse or circuit breaker.

The 3-prong grounding plug minimizes the possibility of electric shock hazard. If the wall outlet you plan to use is only a 2-prong outlet, it is your responsibility to have it replaced with a properly grounded 3-prong wall outlet.

Some models require 230/208-volt ac, protected with a time-delay fuse or circuit breaker. These models should be installed on their own single branch circuit for best performance and to prevent overloading house or apartment wiring circuits, which could cause a possible fire hazard from overheating wires.

Instructions

Tools You Will Need

Phillips-head screwdriver

Scissors or knife

Adjustable wrench

Pencil

Ruler or tape measure

Level

Drill

 

7

Troubleshooting Tips Consumer Support

Page 7
Image 7
GE AKS05, AKV05 Preparing to install the air conditioner, Before You Begin, Electrical Requirements, Tools You Will Need