TABLE OF CONTENTS
P R O G R A M M I N G
CHAPTER 5 GENERAL PROCEDURE OVERVIEW 19
Section 5.1 How to Use This Portion of the Manual 19
5.2 Switch Packs 19
5.3 Programming Mode Entry 20
5.4 Standard Numeric Data Entry
20
CHAPTER 6 ENTERING THE PROGRAMMING MODE 21
Section 6.1 Checksum Error - Protective Mechanism 21
6.2 Password Entry 21
CHAPTER 7 PROGRAMMING GROUP 0: GLOBAL METER SETUP 22
Section 7.1 The Integration Interval 22
7.2 The Meter Address 23
7.3 Communication Baud Rate 23
7.4 System Configuration 24
7.5 Programming Procedure 26
7.6 Time Delay For Relays 1 & 2
26
CHAPTER 8 PROGRAMMING GROUP 1 29
Section 8.1 Scale Selections & Full Scale Settings 29
8.2 Full Scale Settings, Volt & Amp Channels, Volt & Amp Decimal
Placement
29
CHAPTER 9 PROGRAMMING GROUP 2: METER CALIBRATION 31
Section 9.1 Standard Calibration 31
9.2 High End Calibration of Voltage Channels, High & Low End
Calibration of Amperage Channels
32
CHAPTER 10 PROGRAMMING GROUP 4: SET LIMITS & RELAYS 34
Section 10.1 Trip Relay
34
CHAPTER 11 PROGRAMMING GROUP 7: PHASE REVERSAL & PHASE
IMBALANCE SET LIMITS/RELAYS
38
Section 11.1 Voltage Phase Reversal & Phase Imbalance 38
11.2 Trip Relay 38
11.3 Voltage Phase Reversal Detection 39
11.4 Percentage Voltage Phase Imbalance
40
CHAPTER 12 EXITING THE PROGRAMMING MODE 41
GE Industrial Systems iii