www.GEAppliances.com

SAFETY PRECAUTIONS

Safety

Locate the range out of kitchen traffic path and out of drafty locations to prevent poor air circulation.

Be sure all packaging materials are removed from the range before operating it to prevent fire or smoke damage should the packaging material ignite.

Be sure your range is correctly adjusted by a qualified service technician or installer for the type of gas (natural or LP) that is to be used. Your range can be converted for use with either type of gas. See the Installation of the range section.

WARNING: These adjustments must be made by a qualified service technician

in accordance with the manufacturer’s instructions and all codes and requirements of the authority having jurisdiction. Failure to follow these instructions could result in serious injury or property damage. The qualified agency performing this work assumes responsibility for the conversion.

After prolonged use of a range, high floor temperatures may result and many floor coverings will not withstand this kind of use. Never install the range over vinyl tile or linoleum that cannot withstand such type of use. Never install it directly over interior kitchen carpeting.

Do not leave children alone or unattended where a range is hot or in operation. They could be seriously burned.

Do not allow anyone to climb, stand or hang on the oven door, storage drawer, warming drawer or cooktop. They could damage the range and even tip it over, causing severe personal injury.

CAUTION: Items of interest to children should not be stored in cabinets above a range or on the backsplash of a range—children climbing on the range to reach items could be seriously injured.

For your safety, never use your appliance for warming or heating the room.

Large scratches or impacts to glass doors can lead to broken or shattered glass.

Never wear loose-fitting or hanging garments while using the appliance. Be careful when reaching for items stored in cabinets over the range. Flammable material could be ignited if brought in contact with flame or hot oven surfaces and may cause severe burns.

Do not store flammable materials in an oven, a range storage drawer, a warming drawer or near a cooktop.

Do not store or use combustible materials, gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance.

Do not let cooking grease or other flammable materials accumulate in or near the range.

Do not use water on grease fires. Never

pick up a flaming pan. Turn the controls off. Smother a flaming pan on a surface burner by covering the pan completely with a well-fitting lid, cookie sheet or flat tray.

Use a multi-purpose dry chemical or foam-type fire extinguisher.

Flaming grease outside a pan can be put out by covering it with baking soda or, if available, by using a multi-purpose dry chemical or foam-type fire extinguisher.

Flame in the oven or warming drawer can be smothered completely by closing the oven door or drawer and turning the control to off or by using a multi-purpose dry chemical or foam-type fire extinguisher.

Let the burner grates and other surfaces cool before touching them or leaving them where children can reach them.

Never block the vents (air openings) of the range. They provide the air inlet and outlet that are necessary for the range to operate properly with correct combustion. Air openings are located at the rear of the cooktop, at the top and bottom of the oven door, and at the bottom of the range under the warming drawer, storage drawer or kick panel.

Do not lift the cooktop. Lifting the cooktop can lead to damage and improper operation of the range.

Instructions Operating Instructions Installation Instructions Troubleshooting Tips Consumer Support

5

Page 5
Image 5
GE J2B915 installation instructions Safety

J2B915 specifications

The GE J2B915 is an advanced gas turbine engine that represents a significant milestone in aerospace technology, primarily designed for use in regional and business aircraft. Engineered by General Electric, the J2B915 combines innovative design features with state-of-the-art technologies to provide high performance, reliability, and efficiency.

At the heart of the J2B915 is its powerful core, which is designed to operate at high temperatures and pressures. This capability allows the engine to deliver substantial thrust while maintaining a relatively low fuel consumption rate. The engine achieves this efficiency through its advanced compressor and turbine design. The axial-flow compressor, known for its ability to compress air efficiently, contributes to the overall performance of the engine, while the high-pressure turbine extracts energy effectively to drive the compressor.

One of the standout features of the J2B915 is its noise reduction technology. In an era where environmental regulations are becoming increasingly stringent, the engine's design incorporates features aimed at minimizing noise footprint during operation. This is achieved through the use of advanced acoustic materials and innovative turbine blade designs, which work together to reduce noise levels while ensuring optimal performance.

Another key characteristic of the J2B915 is its modular design, which enhances maintainability and serviceability. This modularity allows for easier access to engine components, simplifying routine inspections and repairs. The design philosophy also translates to a reduction in downtime, which is critical for commercial operators seeking to maximize aircraft availability.

The GE J2B915 also boasts impressive durability and reliability. Engineered with advanced materials and coatings, it is capable of withstanding the rigors of continuous operation in various environments. The engine’s reliability is bolstered by GE’s rigorous testing protocols and quality assurance processes, ensuring that it meets the high standards expected by operators worldwide.

In terms of controls and monitoring, the J2B915 utilizes an advanced digital engine control system. This system monitors various performance parameters in real-time, allowing for precise management of engine functions and enhancing operational efficiency. The digital technology also supports predictive maintenance, alerting operators to potential issues before they escalate into more significant problems.

In conclusion, the GE J2B915 gas turbine engine embodies a blend of cutting-edge technologies, robust design, and a commitment to performance. Its high efficiency, low noise output, and reliable operation make it a preferred choice for regional and business aviation markets, cementing its reputation in the competitive landscape of aerospace propulsion systems.