TOOLS YOU WILL NEED

Safety Instructions

Phillips and flat-blade screwdrivers

Pencil and ruler

Two pipe wrenches (one for backup)

Open-end or adjustable wrench

Nut driver or wrench: 1/4

Drill

ADDITIONAL MATERIALS YOU MAY NEED:

Gas line shut-off valve

Pipe joint sealant or UL-approved pipe thread tape with Teflon* that resists action of natural and LP gases. *Teflon: Registered trademark of DuPont

Flexible metal appliance connector (1/2 I.D.). A 5-foot length is recommended for ease of installation but other lengths are acceptable. Never use an old connector when installing a new range.

Flare union adapter for connection to gas supply line (3/4 or 1/2 NPT x 1/2 I.D.)

Flare union adapter for connection to pressure regulator on range (1/2 NPT x 1/2 I.D.)

Liquid leak detector or soapy water.

Lag bolt or 1/2 O.D. Sleeve anchor (for concrete floors only).

Squeeze Connector matching the size of the bracket opening (on the range back behind the wiring cover) and the house conduit. Obtain only if replacing the power cord with conduit.

Operating Instructions Installation

LOCATION GUIDELINES

Do not locate the range where it may be subject to strong drafts. Any openings in the floor or wall behind the range should be sealed. Make sure the openings around the base of the range that supply fresh air for combustion and ventilation are not obstructed by carpeting or woodwork.

Instructions

Your range, like many other household items, is heavy and can settle into soft floor coverings such as cushioned vinyl or carpeting. Use care when moving the range on this type of flooring. It is recommended that the following simple and inexpensive instructions be followed to protect your floor.

The range should be installed on a sheet of plywood (or similar material). When the floor covering ends at the front of the range, the area that the range will rest on should be built up with plywood to the same level or higher than the floor covering.

This will allow the range to be moved for cleaning or servicing. Also, make sure your floor covering will withstand 180°F. (See the Installation Safety Instructions section.)

Make sure the wall coverings around your range can withstand the heat generated (up to 200°F) by the range. (See the Installation Safety Instructions section.)

Troubleshooting Tips

IMPORTANT!

Remove all tape and packaging. Make sure the burners are properly seated and level. Take the accessory pack out of the oven.

Check to be sure that no range parts have come loose during shipping.

41

Consumer Support

Page 41
Image 41
GE J2B915 Tools YOU will Need, Troubleshooting Tips, Operating Instructions Installation, Gas line shut-off valve

J2B915 specifications

The GE J2B915 is an advanced gas turbine engine that represents a significant milestone in aerospace technology, primarily designed for use in regional and business aircraft. Engineered by General Electric, the J2B915 combines innovative design features with state-of-the-art technologies to provide high performance, reliability, and efficiency.

At the heart of the J2B915 is its powerful core, which is designed to operate at high temperatures and pressures. This capability allows the engine to deliver substantial thrust while maintaining a relatively low fuel consumption rate. The engine achieves this efficiency through its advanced compressor and turbine design. The axial-flow compressor, known for its ability to compress air efficiently, contributes to the overall performance of the engine, while the high-pressure turbine extracts energy effectively to drive the compressor.

One of the standout features of the J2B915 is its noise reduction technology. In an era where environmental regulations are becoming increasingly stringent, the engine's design incorporates features aimed at minimizing noise footprint during operation. This is achieved through the use of advanced acoustic materials and innovative turbine blade designs, which work together to reduce noise levels while ensuring optimal performance.

Another key characteristic of the J2B915 is its modular design, which enhances maintainability and serviceability. This modularity allows for easier access to engine components, simplifying routine inspections and repairs. The design philosophy also translates to a reduction in downtime, which is critical for commercial operators seeking to maximize aircraft availability.

The GE J2B915 also boasts impressive durability and reliability. Engineered with advanced materials and coatings, it is capable of withstanding the rigors of continuous operation in various environments. The engine’s reliability is bolstered by GE’s rigorous testing protocols and quality assurance processes, ensuring that it meets the high standards expected by operators worldwide.

In terms of controls and monitoring, the J2B915 utilizes an advanced digital engine control system. This system monitors various performance parameters in real-time, allowing for precise management of engine functions and enhancing operational efficiency. The digital technology also supports predictive maintenance, alerting operators to potential issues before they escalate into more significant problems.

In conclusion, the GE J2B915 gas turbine engine embodies a blend of cutting-edge technologies, robust design, and a commitment to performance. Its high efficiency, low noise output, and reliable operation make it a preferred choice for regional and business aviation markets, cementing its reputation in the competitive landscape of aerospace propulsion systems.