Installation Instructions

RECOMMENDED GAS AND ELECTRIC SUPPLY LOCATION

NOTE: Recommended gas hook-up locations behind range. Gas fittings and shut-off cock should NOT protrude more than 2from the wall to allow the range to fit against the wall.

C

D

30

Check local codes before making connections.

2

2

A

 

 

 

 

30Min.

 

 

 

 

 

13

 

 

 

 

 

 

1/4

Max

18Min.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B Minimum

 

 

 

 

 

 

 

distance to

 

 

 

 

 

 

 

walls above

 

 

 

 

 

 

the cooktop on

 

12

 

 

 

 

each side

 

14

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

36

Models

A

B

C

D

 

 

 

 

8

 

20Wide

2038

2

2

212

3

8

 

24Wide

2438

2

3

512

 

Electrical

 

 

 

 

8

 

 

 

 

 

 

 

 

Connection

 

 

 

 

 

 

 

 

 

 

 

 

8

 

Area

 

 

 

 

 

 

5

 

 

 

 

Gas

Hookup

Area

A

FLEXIBLE CONNECTOR

HOOKUP (Example)

Pressure

Gas

regulator

Flow

 

Adapter

intoRange

 

Flex connector (412 ft. max.)

Adapter

Gas shut-off valve

1/2or 3/4Gas pipe

Installer: Inform the consumer of the location of the gas shut-off valve.

RIGID PIPE HOOKUP (Example)

Pressure

Gas

 

regulator

 

Flow

 

 

 

Black iron

into

 

 

 

pipe 412

Range

 

90° Elbow

 

 

90° Elbow

 

 

 

 

Black iron

 

Nipple (may not

pipe

 

 

 

be needed)

Union

 

 

 

 

Nipple

 

 

Gas shut-off

 

1/2or 3/4Gas pipe

valve

 

 

Installer: Inform the consumer of the location of the gas shut-off valve.

28

Page 28
Image 28
GE JGAS02 owner manual Recommended GAS and Electric Supply Location, Flexible Connector, Hookup Example

JGAS02 specifications

The GE JGAS02 is an advanced gas turbine designed to meet the growing demand for efficient and reliable energy solutions. With a focus on performance and sustainability, the JGAS02 incorporates a series of cutting-edge technologies that enhance its operational capabilities while reducing its environmental footprint.

One of the standout features of the JGAS02 is its high efficiency rating. The turbine boasts an advanced airfoil design that optimizes airflow and enhances combustion efficiency. This results in reduced fuel consumption and lower emissions, making it an ideal choice for power generation in a world increasingly focused on clean energy solutions.

The JGAS02 utilizes a sophisticated control system that allows for precise monitoring and management of its operation. This system is equipped with predictive analytics, enabling operators to anticipate maintenance needs and minimize downtime. This not only increases the reliability of the turbine but also extends its operational lifespan, providing significant cost savings over time.

Another key characteristic of the JGAS02 is its versatility. It can operate with a variety of fuels, including natural gas, biogas, and even liquid fuels, allowing it to adapt to different market needs and regulatory environments. This flexibility makes it a popular choice for both industrial applications and power plants seeking to diversify their energy sources.

In terms of technology, the JGAS02 features state-of-the-art cooling systems that enhance turbine performance while protecting critical components from high temperatures. Proprietary materials and coatings are employed to ensure durability and longevity in demanding operating conditions.

Moreover, the JGAS02's modular design simplifies maintenance and upgrades, making it easier for operators to implement enhancements as technology evolves. This attention to future-proofing aligns with GE’s commitment to providing long-term value to its customers.

Overall, the GE JGAS02 represents a significant advancement in gas turbine technology. With its blend of high efficiency, operational reliability, and environmental sustainability, it is well-positioned to meet the challenges of modern energy production while supporting a transition to a cleaner energy future.