GE JP989SKSS 11INSTALLING THE HOLD-DOWNRETAINERS, 13INSTALLING THE BLOWER TO THE PLENUM

Models: JP989SKSS

1 64
Download 64 pages 44.59 Kb
Page 23
Image 23
11INSTALLING THE HOLD-DOWN RETAINERS

Installation Instructions

INSTALLING THE COOKTOP

11INSTALLING THE HOLD-DOWN RETAINERS

NOTE: Check for glass flatness in Step 10 before installing hold-down retainers.

Hold- down retainer

Hold-down retainer

Countertop 12INSTALLING THE BLOWER PLENUM TO THE COOKTOP

Thumb screw

Secure cooktop to the counter using the hold-down retainers and thumb screws shipped with the unit (one on each side).

12INSTALLING THE BLOWER PLENUM TO THE COOKTOP

Slide the plenum, with the blower opening on the left, into the opening in the bottom of the cooktop. Push up on the plenum until the stops on the plenum contact the bottom of the cooktop, and snap the plenum into place. (You may have to move the plenum back and forth to work it into place.)

Secure the plenum to the bottom of the cooktop, on each side, using the four (4) screws provided. Further secure the plenum to the cooktop, from the top side, using the two screws (2) provided.

13INSTALLING THE BLOWER TO THE PLENUM

Orient the blower discharge opening to match the ductwork in Steps 6 and 7. Slide the four threaded studs on the side of the blower housing into the four holes on the side of the plenum.

NOTE: See Step 14 for installing the transition duct to the blower. It may be easier to install the transition duct to the blower before installing the blower to the plenum.

From the vent opening in the top of the cooktop, fasten the blower assembly securely to the plenum with four (4) nuts.

4 Nuts 13INSTALLING THE BLOWER TO THE PLENUM (7/16socket required)

23

Page 23
Image 23
GE JP989SKSS 11INSTALLING THE HOLD-DOWNRETAINERS, 13INSTALLING THE BLOWER TO THE PLENUM, Installation Instructions