CDT One Event Timer Exerciser

Load / No-Load

One event Exerciser with adjustable Timer. Exercise duration can be set between 5 and 60 minutes in

1 minute increments. Can be configured to run every 1,7,14, or 28 days. Factory default is 20 minutes.

How to CONFIGURE (CFG) and Set (SET) the Timer Exerciser

1.Beginning from the S1 OK screen, press MORE then CFG.

2.Press MORE to scroll to CONFIG TIMER EXERCISER screen.

3.The third line of the CONFG TIMER EXERCISER will show either DAILY, WEEKLY, 14 DAY, 28 DAY, or OFF.

4.If the third line of the CONFG TIMER EXERCISER shows DAILY, WEEKLY, 14 DAY, or 28 DAY as desired, then proceed to step 10.

5.If the third line of the CONFG TIMER EXERCISER shows OFF or if another timer selection is desired, continue.

6.Press SEL.

7.Enter ACCESS code located on white label on the back of the controller.

8.Press UP or DOWN to select DAILY, WEEKLY, 14 DAY, or 28 DAY as desired.

9.Press SAVE.

10.Press MORE to scroll to CONFG TIMER EXERCISER (XFR) or (NO XFR).

11.Press Up or Down to select XFR (Load Transfer) or NO XFR (No Load Transfer).

12.Press SAVE.

13.Press MORE repeatedly to BACK then S1 OK screen.

Set (SET) the Exerciser:

14.Beginning from the S1 OK screen, press MORE then SET.

15.Press MORE repeatedly until EXER S2 RUN TIME screen.

16.Press SEL

17.Enter ACCESS code located on white label on the back of the controller.

18.Press SEL

19.Cursor is indicated as a line under character to

be changed. Change values with up and down keys.

20.Press SAVE when complete.

21.Press MORE repeatedly until SET USER SETUP then press BACK then ESC to the S1 OK screen.

How to Initiate CDT Exerciser and to start an exercise cycle every 1, 7, 14, or 28 days

From S1 screen

1)Press TEST

2)Press MORE

3)Press START TEST TIMER (to initiate Test).

If the CDT Exerciser is Factory configured for a Load Exerciser, the Controller will immediately start a load exercise. The controller will start the generator, transfer the load to Source 2 and remain in Source 2 for the duration set for EXER S2 RUN TIME in the SET menu. The controller will retransfer the load back to Source 1 after the S1 stable timer has timed out and run the generator unloaded for the duration of the S2 stop delay timer (Engine Cool Down Timer).

If the CDT Exerciser is Factory configured for a No-Load Exerciser, the Controller will immediately start a No-load exercise. The controller will start the generator and run it unloaded for the duration of the S2 stop delay timer (Engine Cool Down Timer).

Exercise will be repeated at the same time as initiated on every 1, 7, 14, or 28 days according to the selection made in the Configure CFG menu.

How to Bypass (Cancel) an exercise during an exercise cycle

1)Press BPASS

2)Allow the controller to complete the Engine

cool down cycle

If the CDT Exerciser is Factory configured for a No-Load Exerciser Or allow the controller to complete retransfer to Source 1 If the CDT Exerciser is Factory configured for a Load Exerciser

How to Bypass the next exercise event and Keep the rest of scheduled events unchanged

1)Press Test

2)Press MORE

3)Press BYPASS EXER

To re-institute the next exercise event back,

press CANCL BPASS

How to initiate a new exercise start time

1)Press TEST

2)Press MORE

3)Press EXER CANCL

4)Press START TIMER TEST

How to check the next exercise event

1)From S1 OK screen, press MORE three times.

2)The unit will display the PLANT EXERCISER NEXT event in DAYS, HOURS, and MINUTES

3)Press ESC to S1 OK Screen.

Notes:

-*E* appears in the upper right hand corner of LCD screen when exercise is impending.

-For Load Exerciser, actual exercise period (ATS in S2 position)= CDT (Exerciser)

timing period +T (S1 stable Timer) timing period.

14

ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

GE Zenith Controls

 

Page 16
Image 16
GE ZBTSD manual CDT One Event Timer Exerciser, Load / No-Load

ZBTS, ZBTSD specifications

General Electric (GE) has established itself as a leader in the field of industrial automation and control systems, with its ZBTSD and ZBTS series representing some of the most advanced technology available. These systems are engineered to enhance performance, efficiency, and reliability in various industrial applications.

The ZBTSD, or Zero-Based Time Series Data, is designed to optimize data storage and retrieval processes. One of its main features is its ability to provide real-time monitoring and analytics of dynamic processes. This capability is crucial for industries that require immediate insights into their operations, helping to minimize downtime and enhance decision-making. The ZBTSD utilizes advanced machine learning algorithms to identify trends and patterns, enabling predictive maintenance that can significantly reduce operational costs.

On the other hand, the ZBTS, or Zero-Based Time Series Solutions, focuses on delivering comprehensive solutions for time series data management. This system is adept at handling vast amounts of data generated by industrial equipment, ensuring that organizations can efficiently process and analyze this information. Key characteristics of ZBTS include scalability, which allows companies to expand their systems as their data grows, and flexibility, permitting integration with various data sources.

One notable technology employed in both ZBTSD and ZBTS is cloud computing. By leveraging the cloud, these systems offer enhanced data accessibility and collaboration capabilities. Users can access critical data anytime, anywhere, facilitating timely responses to operational challenges.

Another significant feature is robust cybersecurity measures. With the increasing number of cyber threats in industrial environments, GE has prioritized security in the ZBTSD and ZBTS systems. These solutions are equipped with advanced encryption protocols and user authentication mechanisms to protect sensitive data from unauthorized access.

The user interface of both systems is designed to be intuitive, allowing operators to interact with the systems efficiently. Customizable dashboards provide visual representations of key performance indicators, making it easier for users to comprehend complex data at a glance.

In summary, GE's ZBTSD and ZBTS systems exemplify the integration of cutting-edge technology in industrial automation. Their emphasis on real-time data analytics, scalability, cybersecurity, and user-friendly design positions them as invaluable tools for organizations seeking to enhance operational efficiency and decision-making. As industries continue to evolve, these systems will play a pivotal role in shaping the future of industrial automation and data management.