CDP Clock Exerciser

Load / No-Load Clock Exerciser

Allows the Generator to start and run unloaded or to simulate a power failure, start Generator and run under load. Can be configured by the end user for 1, 7, 14, 28, or 365 day cycles.

A total of 7 independent No Load exercise periods (up to 10 hours each) can be programmed for each of the daily, weekly, 14-day, and 28-day exercisers.

A total of 24 independent No Load exercise periods (up to 10 hours) can be programmed for the 365-day Exerciser.

How to Configure (CFG) the Exerciser

1.Beginning from the S1 OK screen, press MORE then CFG.

2.Press MORE to scroll to CONFIG CLOCK EXERCISER screen.

3.The third line of the CONFG CLOCK EXERCISER will show either DAILY, WEEKLY, 14 DAY, 28 DAY, 365 DAY or OFF.

4.If the third line of the CONFG CLOCK EXERCISER shows DAILY, WEEKLY, 14 DAY, 28 DAY, or 365 DAY as desired, press MORE repeatedly to BACK.

Press ESC then proceed to the SET menu to set the EXERCISER.

5.If the third line of the CONFG CLOCK EXERCISER shows OFF, continue.

6.Press SEL.

7.Enter ACCESS code located on white label on the back of the controller.

8.Press UP or DOWN to select DAILY, WEEKLY, 14 DAY, 28 DAY, or 365 DAY as desired.

9.Press SAVE.

10.Press MORE repeatedly to BACK then ESC to S1 OK screen.

How to set (SET) the DAILY Exerciser

1.Beginning from the S1 OK screen, press MORE then SET.

2.Press MORE repeatedly until SET EXERCISER screen.

3.Press SEL.

4.Enter ACCESS code located on white label on the back of the controller.

5.Press SEL

6.Cursor is indicated as a line under character to

be changed. Change values with up and down keys. Press SAVE after each entry to save value and to move to the next value to be changed.

7.Press BACK when complete.

8.Press MORE repeatedly until SET USER SETUP. Press BACK then ESC to the S1 OK screen.

How to Bypass (Cancel) an exercise during an exercise cycle

1)Press BPASS

2)Allow the controller to complete the Engine cool down cycle.

If the CD Exerciser is configured or Set for a No-Load Exercise. Or allow the controller to complete retransfer to Source 1. If the CD Exerciser is configured for a Load Exerciser

How to Bypass the next exercise event and Keep the rest of scheduled events unchanged

1)Press TEST

2)Press MORE

3)Press BYPASS EXER

To re-institute the next exercise event back,

press CANCL BPASS

How to check the next exercise event

1)From S1 OK screen, press MORE three times.

2)The unit will display the PLANT EXERCISER NEXT event in DAYS, HOURS, and MINUTES

3)Press ESC to S1 OK Screen.

Notes:

In the S1 OK screen, an (*E*) appears in the upper right hand corner of LCD screen when exercise

is impending.

For Load Exerciser, actual exercise period (ATS in S2 position)= CDT (Exerciser)

timing period +T (S1 Stable Timer) timing period.

A value greater than zero must be entered in the Exerciser duration field to be accepted as a valid exercise period.

The Exercise cycle will be repeated on a regular basis as programmed and initiated in the SET menu depending on what Exerciser was configured (selected) in the CFG menu.

Indicates # of

Exercise Periods

Indicates type of Exerciser DAILY, WEEKLY, 14-DAY, 28-DAY or 365-DAY

Indicates Exerciser start: Time for DAILY Exerciser

Time & Day for WEEKLY Exerciser Time, Date & Month for 14-DAY, 28-DAY and 365-DAY Exerciser (24 Hour System)

Cursor

#1

 

 

S E T

 

 

NL

 

 

 

EXERCISER

 

 

 

v

00:00

BACK

^

 

 

SAVE

 

 

 

 

 

 

 

 

Up and Down

 

 

 

 

 

Use to change values.

 

 

 

To previous field

 

 

 

 

 

To save value and to

 

 

 

 

 

move cursor to next

or to exit screen.

 

 

 

 

 

 

 

 

 

 

field to be changed.

 

 

 

 

 

 

 

 

 

 

 

 

 

Load No-Load (CDP)

Exercise Indicator

Exercise duration for this event in hours and minutes up to 10 hours per event

Figure 10

GE Zenith Controls

ZBTS / ZBTSD Operation and Maintenance Manual (71R-4000A)

15

Page 17
Image 17
GE ZBTSD manual CDP Clock Exerciser, Load / No-Load Clock Exerciser

ZBTS, ZBTSD specifications

General Electric (GE) has established itself as a leader in the field of industrial automation and control systems, with its ZBTSD and ZBTS series representing some of the most advanced technology available. These systems are engineered to enhance performance, efficiency, and reliability in various industrial applications.

The ZBTSD, or Zero-Based Time Series Data, is designed to optimize data storage and retrieval processes. One of its main features is its ability to provide real-time monitoring and analytics of dynamic processes. This capability is crucial for industries that require immediate insights into their operations, helping to minimize downtime and enhance decision-making. The ZBTSD utilizes advanced machine learning algorithms to identify trends and patterns, enabling predictive maintenance that can significantly reduce operational costs.

On the other hand, the ZBTS, or Zero-Based Time Series Solutions, focuses on delivering comprehensive solutions for time series data management. This system is adept at handling vast amounts of data generated by industrial equipment, ensuring that organizations can efficiently process and analyze this information. Key characteristics of ZBTS include scalability, which allows companies to expand their systems as their data grows, and flexibility, permitting integration with various data sources.

One notable technology employed in both ZBTSD and ZBTS is cloud computing. By leveraging the cloud, these systems offer enhanced data accessibility and collaboration capabilities. Users can access critical data anytime, anywhere, facilitating timely responses to operational challenges.

Another significant feature is robust cybersecurity measures. With the increasing number of cyber threats in industrial environments, GE has prioritized security in the ZBTSD and ZBTS systems. These solutions are equipped with advanced encryption protocols and user authentication mechanisms to protect sensitive data from unauthorized access.

The user interface of both systems is designed to be intuitive, allowing operators to interact with the systems efficiently. Customizable dashboards provide visual representations of key performance indicators, making it easier for users to comprehend complex data at a glance.

In summary, GE's ZBTSD and ZBTS systems exemplify the integration of cutting-edge technology in industrial automation. Their emphasis on real-time data analytics, scalability, cybersecurity, and user-friendly design positions them as invaluable tools for organizations seeking to enhance operational efficiency and decision-making. As industries continue to evolve, these systems will play a pivotal role in shaping the future of industrial automation and data management.