GE ZIDS240 Custom Panel Models Only, Black or Stainless Steel Toekick Options, Design Guide

Models: ZIDS240 ZIDI240

1 8
Download 8 pages 47.09 Kb
Page 5
Image 5
Black or Stainless Steel Toekick Options

Design Guide

FOR MODEL ZIDI240 WITH CUSTOM DRAWER PANELS AND HANDLES

THE INSTALLATION SPACE

PRODUCT CLEARANCES

IMPORTANT: Double-Drawer Refrigerators are designed to be built-in only. They cannot be used free-standing.

When installed in a corner:

Countertop

Double-Drawer

Locate

Outlet

10-1/2"

34-1/2"-35" 9" Max. Custom Panel Models Only

1-1/2"

24"

23-1/8" min.

Manual background 23-3/4" Min. Manual background

NOTE: Handles not supplied.*

24-7/8"

34-1/4" Manual background to 34-3/4"

23-3/4"

Clearance for Door

Opening 2-1/2" min.

Allow 2-1⁄2min. clearance between Double-Drawer and adjacent cabinet, wall or other appliances. Allow 23-1⁄8min. clearance from the front for drawer opening.

NOTE: Custom handle clearances may vary depending on the standoff of the custom handles.

• Test the drawer openings. Carefully open and close

the drawers. The drawers should not rub or catch on

adjacent cabinetry. Notify the installer if the drawers

*Custom handle clearances may vary, depending on the standoff of the custom handles.

The cutout depth should be 24

The cutout dimensions shown allow for full drawer extension.

NOTE: The drawers should be flush with the surrounding cabinets.

Additional Specifications

A 120 volt 60Hz., 15 or 20 amp power supply is required. An individual properly grounded branch circuit or circuit breaker is recommended. Install a properly grounded 3-prong electrical receptacle recessed into the back wall as shown. Electrical must be located on rear wall as shown. NOTE: GFCI (ground fault circuit interrupter) is not recommended.

make contact with cabinetry. NOTE: When installing

custom panels and handles, use above clearances as

a general guide but adjust according to the installation.

Choose the location:

These products may be closed in on the top and three sides as long as the front is unobstructed for air circulation and proper access to the drawers.

Do not install these products where the temperature will go below 55°F (13°C) or above 90°F (32°C).

These products are not designed to be stacked one over the other

Black or Stainless Steel Toekick Options

These products are shipped with two toekicks,

a stainless steel and a black toekick. For shipping purposes, one of the toekicks will be secured to the back of the unit and the second will be installed, in place, on the unit. Keep the unused toekick, and other unused or removed parts, for future use.

SIDE-BY-SIDE INSTALLATIONS –

Custom Panel Models Only

For a complete refreshment center, install a Double-Drawer Refrigerator beside a Beverage Center or Wine Chiller/ Wine Reserve.

A side-by-side installation requires at least a 47-1/2wide opening. No trim kits required.

Products must operate from separate, properly grounded receptacles.

 

Locate

 

Outlet

 

10-1/2" 14"

10-1/2" 24"

34-1/2"-35"

9"

9"

 

15"

1-1/2"

 

 

 

47-1/2" Min.

 

*NOTE: Additional clearances

 

may be required.

 

5

Page 5
Image 5
GE ZIDS240 Custom Panel Models Only, Black or Stainless Steel Toekick Options, Design Guide, The Installation Space