GE Monogram ZBD6800K, ZBD6880K Installation Instructions, Prudence, Prepare Hot Water Line

Models: ZBD6890K ZBD6800K ZBD6880K

1 16
Download 16 pages 32.8 Kb
Page 7
Image 7
Installation Instructions

Installation Instructions

PREPARE HOT WATER LINE

The line may enter from either side, rear or floor within the shaded area shown in Figure F.

The line may pass through the same hole as the electrical cable and drain hose. Or, cut an additional 1-1/2" dia. hole to accommodate the water line.

If power cord with plug is used, water line must not pass through power cord hole.

Shut-off1-1/2" Dia.

Valve Hole

PREPARE HOT WATER LINESTEP 1 CHECK DOOR BALANCE BEFORE YOU BEGIN

Locate and set aside the two Phillips head mounting screws wrapped with yellow tape

and stuck to the top or side of the dishwasher.

STEP 1 CHECK DOOR BALANCE

With dishwasher on the wood skid, check the door balance by opening and closing the door.

If the door drops when released, increase the spring tension. If the door rises when released, decrease the tension.

NOTE: The addition of the custom panel on model ZBD6890 will require exchange of the factory installed springs. Use the heavy-duty springs provided. See the custom panel template for additional instructions.

Hot Water Line Connection

2"

From

Cabinet

Cabinet Face PRUDENCE

19" From Wall

2" From Floor

Figure F

Position the spring for increased or decreased tension as required.

NOTE: Adjust both balance springs to the same amount of tension to prevent excessive door twisting during use.

Water Line Connection

Turn off the water supply.

Install a hand shut-off valve in an accessible location, such as under the sink. (Optional, but strongly recommended and may be required by local codes.)

Water connection is on the left side of the dishwasher. Install the hot water inlet line, using no less than 3/8" O.D. copper tubing. Route the line as shown in Figure F and extend forward at least 19" from rear wall.

Adjust water heater for 120°F to 150°F temperature.

Flush water line to clean out debris.

The hot water supply line pressure must be 20-120 PSI.

Manual backgroundCAUTION

Manual background Do not remove wood base until you are ready to install the dishwasher. The dishwasher will tip over when the door is opened if the wood base is removed.

Manual backgroundPRUDENCE

Manual background Il ne faut pas enlever la base de bois avant d’être prêt à installer le lave-vaisselle. Quand la base de bois est enlevée et la porte ouverte, le lave-vaisselle bascule.

Figure G

Use This

 

 

Mounting

 

Hole

Pulley

Manual backgroundManual background Decrease

Tension

Shoulder

Correct Spring

Increase

 

Tension

 

Cable Routing

 

 

TIP: If door does not open easily or falls too quickly, check the spring cable routing. Check that the cable is properly aligned on the pulley (as shown).

7

Page 7
Image 7
GE Monogram ZBD6800K Installation Instructions, Prudence, Prepare Hot Water Line, Check Door Balance, Before You Begin