GE Monogram ZTD910, ZKD910 installation instructions Précautions, Contents, Contre Le Basculement

Models: ZKD910 ZTD910

1 8
Download 8 pages 49.27 Kb
Page 2
Image 2
PRÉCAUTIONS :

Before you begin – Read these instructions completely and carefully. IMPORTANT – Save these instructions for local inspector’s use.

IMPORTANT – OBSERVE ALL GOVERNING CODES AND ORDINANCES. Note to Installer – Be sure to leave these instructions with the Consumer.

Note to Consumer – Keep these instructions with your Owner’s Manual for future reference.

CONTRE LE BASCULEMENTWARNING This appliance must be properly grounded. See “Electrical Supply”, page 4.

ContentsManual backgroundManual backgroundATTENTION Cet appareil doit être correctement mis à la terre. Consulter page 4.

If you received a damaged warming drawer, you should immediately contact your dealer or builder.

Proper installation is the responsibility of the installer. Product failure due to improper installation is not covered under the GE Appliance Warranty. See the Use & Care Guide for warranty information.

WARNING:

ANTI-TIP PRECAUTIONS

An anti-tip brace must be installed to prevent the drawer from tipping forward when opened and loaded. Failure to do so could result in personal injury.

PRÉCAUTIONS :

Use this appliance only for its intended purpose.

Check with local utilities for electrical codes that apply in your area. Local codes vary. Installation electrical connections and grounding must comply with applicable codes. In the absence of local codes, the drawer should be installed in accordance with National Electrical Code ANSI/NFPA 70-1990 or latest edition.

CONTRE LE BASCULEMENT

Pour éviter les blessures, il faut installer une patte de retenue pour empêcher le tiroir de basculer quand il est ouvert et plein.

For Monogram local service in your area, 1.800.444.1845.

For Monogram service in Canada, call 1.888.880.3030.

For Monogram Parts and Accessories, call 1.800.626.2002.

Contents

Design Information

 

Models Available

3

Product Dimensions

3

Accessories

3

Tools and Materials Required

3

Installation Preparation

 

Advance Planning

4

Grounding the Appliance

4

Remove the Packaging and Parts

5

Installation Below a Countertop

5

Installation Below Wall Ovens

6

Installation

 

Step 1: Provide Cabinet Support and Anti-Tip Bracket

7

Step 2: Install Warming Drawer

7

2

Page 2
Image 2
GE Monogram ZTD910, ZKD910 installation instructions Précautions, Contents, Contre Le Basculement