Operator's Manual

 

 

 

 

Pre-operation Inspection

oBe sure that the operator's, safety and responsibilities manuals are complete, legible and in the storage container located on the platform.

oBe sure that all decals are legible and in place. See Decals section.

oCheck for hydraulic oil leaks and proper oil level. See Maintenance section.

oCheck for battery fluid leaks and proper fluid level. Add distilled water if needed. See Maintenance section.

Check the following components or areas for damage, improperly installed or missing parts and unauthorized modifications:

oElectrical components, wiring and electrical cables

oHydraulic power unit, tank, hoses, fittings, cylinders and manifolds

oBattery pack and connections

oDrive motors

oTires and wheels

oLimit switches and alarms

oNuts, bolts and other fasteners

oPlatform entry mid-rail bar or gate

oSequencing cables and pulleys

oPlatform extension (if equipped)

oWork trays and bike racks (if equipped)

oMast columns and counterweight

oPlatform controls

oBrake release components

PRE-OPERATION INSPECTION

Check the entire machine for:

oCracks in welds or structural components

oDents or damage to the machine

oBe sure that all structural and other critical components are present and all associated fasteners and pins are in place and properly tightened.

Part No. 97779

GR-12GR-15GR-20

13