REPAIR INSTRUCTIONS - HR2527A/HR3025/HR3030
NOTE: Always take time to lubricate all metal and nonmetal parts with a light film of oil before reassembly. This step will ensure proper fit, at the same time protecting the pump's nonmetal parts (elastomers) from cutting and scoring.
7.Tap the back of the manifold (28) with a rubber mallet to dislodge, and slide off the plungers (10). Take note of the position of the discharge port so as to place the port in the same position during reassembly.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
54 | 56 | 48 | 47 | 48 | 46 | 66 | |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
8.With a 19mm socket wrench, remove the guide plug (54) and
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
74 | 16 | 22 | 20 | 18 | 19A | |||||
|
|
|
|
|
|
|
|
|
|
|
9.Remove the valve cones (19A), valve springs (18),
11.Reassemble in reverse order. Fill the crankcase until the proper amount of oil (see specifications page 3). The pump is now ready for operation.
10.If the crankcase oil seals (15) are to be replaced, they can be removed by prying loose with a small screwdriver. Take care not to make contact with the plunger (10) and pry out the oil seals from their housing.
Contact Giant Industries for service school information. Phone: (419) 531-4600
11