Global Machinery Company CDB250MS, CDB305MS Maintenance Power cord maintenance, Cleaning

Models: CDB305MS CDB250MS

1 20
Download 20 pages 5.25 Kb
Page 18
Image 18

Note. To cut to the left-hand side of the blade, align the left- hand laser line with the pencil mark. To cut to the right-hand side of the blade, align the right-hand laser line with the pencil mark.

5.Plug in the machine and start the motor.

6.Press the release latch (31).

7.When the blade is at its maximum speed (approximately 2 seconds), lower the blade through the workpiece.

8.After completing the cut, switch off the laser light on/off switch (2).

9.After each use, clean the laser light assembly (1) as described below:

Switch off the laser light switch (2) and then remove the plug from the power point.

With the saw arm (5) in the raised position, use a soft brush to dust away the sawdust build-up around the assembly.

Note. Wear eye protection whilst brushing the dust away.

Maintenance

WARNING. Always ensure that the tool is switched off and the plug is removed from the power point before making and adjustments or maintenance procedures.

Power cord maintenance

If the supply cord needs replacing, the task must be carried out by the manufacturer, the manufacturer’s agent, or an authorised service centre in order to avoid a safety hazard.

Cleaning

1.Keep the tool’s air vents unclogged and clean at all times.

2.Remove dust and dirt regularly. Cleaning is best done with a soft brush or a rag.

3.Re-lubricate all moving parts at regular intervals.

4.Never use caustic agents to clean plastic parts.

CAUTION. Do not use cleaning agents to clean the plastic parts of the saw. A mild detergent on a damp cloth is recommended.

General inspection

Regularly check that all the fixing screws are tight. They may vibrate loose over time.

18

Page 18
Image 18
Global Machinery Company CDB250MS, CDB305MS Maintenance Power cord maintenance, Cleaning, General inspection