Setup
20 312359J
Configure to Supply Power

(Non-hazardous location sprayers only.)

NOTE:
Disregard terminal numbers on disconnect switch
blocks. Wire to positions shown.
1. Locate power jumpers.
2. Use a flat-blade screwdriver to move red jumpers
from storage positions to positions for your power as
shown below. Push jumpers firmly into new position.
NOTE:
For 230V, 1 Phase and 230V, 3 Phase Installations,
change jumper positions as shown below. Machine is
shipped with jumpers in the fail-safe 380 3Ø position.
3. Close junction box cover.
ti18664a
Power
Jumpers
L3 L2 L1 N

230V 1ø

L3 L2 L1 N

230V 3ø Delta

L3 L2 L1 N

380V 3ø WYE

TB2
Termin al Blo cks
Position red jumpers
as shown
(as shipped)