![](/images/new-backgrounds/1314526/314526147x1.webp)
Appendix A
Totalizers and Job Number
View the grand and batch totals for each pump and both pumps combined. The units of measurement are dis- played on the bottom of the screen and displayed in the units of measurement selected during setup.
Grand total is the amount of material the system has dispensed during its lifetime. Batch total is the amount of material dispensed since the last user reset.
A job number can be entered to identify the batch total.
Clear Batch Totalizer
To clear the batch totalizer values for A, B, and A+B,
press to set all values to zero.
Maintenance 1 Screen
View setpoints for the amount of material that needs to move through both pumps and dosing valves that will result in a maintenance warning.
Maintenance 2 Screen
View number of days between changing the main incoming air filter before a reminder advisory is issued.
Icon Function
Displays batch total and grand total for pump A. The grand total is displayed at the top, and the batch total is displayed at the bottom.
Displays batch total and grand total for pump B. The grand total is displayed at the top, and the batch total is displayed at the bottom.
Displays batch total and grand total for both pumps combined. The grand total is displayed at the top, and the batch total is displayed at the bottom.
Displays job number for each spray period.
Change Job Number
1.Press to highlight the first digit. Press
and to change the number and
and
to move to the next digit. Press
to
save the number or to cancel.
Reset Maintenance Counter
1.Press and
to scroll through and select the maintenance field to reset.
2.Press to reset the maintenance counter to zero.
74 | 312359J |