
Engine Replacement
Engine Replacement
Engine Removal
1.Perform Pressure Relief Procedure, page 7.
2.Disconnect ground terminal of battery, then dis- connect the positive terminal.
3.Disconnect white and yellow electrical wires located behind muffler.
83
ti17381a
4.Disconnect the positive red wire (90) attached to the engine.
ti17380a
90
5.Disconnect gas line (260) and the evaporation line (261) from the engine.
260
ti17379a
6.Remove belts, see Compressor Belt and Hydrau- lic Pump Belt Replacement, page 9.
7.Remove four bolts (3) from the engine (which will also disconnect the ground wire).
3
ti17384a
8.Use a lift ring to lift and turn the engine (83) to remove it from the frame. See engine manual for lift locations.
Pulley Removal
1.Loosen set screw (21) located on the side of the pulley.
21
ti17382a
2. Remove bolt (19) in the center of pulley.
ti17383a
19
3. Remove pulley from engine
16 | 3A1696C |