Start-Up

Color Change Procedure

3. Turn Main Air Supply Valve to the “off” position.

 

This will relieve the air pressure on the Air Motor.

1.7XUQ$LU&RQWURO9DOYHFORFNZLVHWR³&2/25

CHANGE” position.

valve

cut out

2.Turn Material Valve, P/N 21192-00, from Material Hose to Recirculating Hose (handle in vertical position). This will relieve pressure on Material Hose.

4.3XOODQGURWDWH3LYRWNQRE to disengage the catalyst drive arm.

valve

Drive arm

3XPSZLOOF\FOHWRGRZQVWURNHDQGVWRS

Once the pumps are in the down position, close material valve.

5.7XUQ0DWHULDO9DOYH DWJXQ FORFNZLVHWR³2))´ position. Material valve should remain in “OFF” position until color Material Hose is required again.

6.'HWDFK4XLFN'LVFRQQHFW)LWWLQJ *XQHQG 

31IURP4XLFN'LVFRQQHFW)LWWLQJ +RVH

end),P/N 20261-00.

CJ-154 O-RING

O-RING

16

GC-1392Z

Page 16
Image 16
Graco Inc GC-1392 Z Start-Up Color Change Procedure, 7XUQ$LU&RQWURO9DOYHFORFNZLVHWR³&2/25