Troubleshooting (cont.)
Brewing Problems
Problem |
| Possible Causes | Service Check | Remedy | |
|
|
|
|
|
|
Brew volume too | • Sprayhead clogged. | • Visually check for | • Clean all holes. | ||
large or too small |
|
| clogging of holes |
|
|
|
|
| in brewhead. |
|
|
| • Brew valves clogged | • Visually inspect | • Clean lime from valve. Seat, | ||
| with lime deposits. | brew valve at | cup or entire valve may need | ||
|
|
| hose connections. | replacement. | |
| • Water supply pressure | • Check to see that fill | • Supply water at adequate | ||
| or flow rate not | valve cycles on and | pressure and flow rate. | ||
| adequate. | off frequently during |
|
| |
|
|
| brew cycle when all |
|
|
|
|
| brew heads are used |
|
|
|
|
| simultaneously. Check |
|
|
|
|
| to ensure that water |
|
|
|
|
| supply line is 3/8” and |
|
|
|
|
| pressure is between |
|
|
|
|
| 30 and 80 psi (207 and |
|
|
|
|
| 552 KPA). |
|
|
|
|
|
|
|
|
Brew volume | • Water supply pressure | • Check water pressure | • Plumb water supply so that | ||
erratic | fluctuates. | with and without other | water pressure is not | ||
|
|
| appliances operating. | significantly affected by | |
|
|
|
| other appliances. | |
|
|
|
|
|
|
|
| Note: Small variations from batch to batch are normal. |
| ||
|
|
|
|
|
|
|
|
|
|
|
|
Brew cycle will | • Optional momentary | • Check to see that | • If fully engaged switch does | ||
not start | switch to indicate | container fully engages | not complete circuit across | ||
| container in place not | switch. Check for | terminals of switch, replace | ||
| engaged or faulty. | continuity across switch | switch. | ||
|
|
| when switch is engaged. |
|
|
| • Brew circuit connections | • Check to see that | • Secure connections. | ||
| not secure. | connector |
|
| |
|
|
| is securely connected to |
|
|
|
|
| control board. Check to |
|
|
|
|
| see that all connections |
|
|
|
|
| from controller through |
|
|
|
|
| brew valve are secure. |
|
|
| • Brew valve faulty. | • Check to see if there is | • If there is 24 Vac across | ||
|
|
| 24 Vac across brew valve | terminals and brew valve is | |
|
|
| terminals. | not open, replace valve. | |
| • Touchpad faulty. | • Check to see that | • If connections are secure, | ||
|
|
| touchpad connections | other functions appear normal | |
|
|
| to control board are | and touchpad will not initiate a | |
|
|
| secure. | brew cycle, replace touchpad. | |
|
|
|
|
|
|
|
|
|
|
|
|
Shuttle Brewers & Airpot/Shuttle Brewers | Page 25 |