Grindmaster TEA-300 Electrical Requirements cont, Initial Start-Up, Use Control Functions

Models: TEA-300

1 16
Download 16 pages 5.96 Kb
Page 5
Image 5
Electrical Requirements (cont.)

Electrical Requirements (cont.)

!WARNING: ELECTRIC SHOCK HAZARD

NEVER USE THE GROUND CONDUCTOR AS A NEUTRAL. THIS COULD CAUSE ELECTROCUTION.

3. The body of the brewer must be grounded. A ground lug is provided for this purpose.

Initial Start-Up

1.Turn on the water supply to the brewer. Check for leaks at supply line to fill valve connection.

2.Make sure the power switch is turned to the “Off” position. The power switch is located on the upper back panel of the brewer.

3.Plug in the unit’s power cord into a properly grounded receptacle.

4.Place the brew basket into the brew rails of the brewer.

5.With the dispenser’s cover removed, place the tea dispenser onto the tea brewer’s base.

6.The water tank needs to be primed. Press the Start switch to begin filling the water tank. After approximately 5 minutes the brew will terminate and the water fill valve will turn off. Drain off the dispensed water from the dispenser and press the Start switch again to continue. You will have to perform this step until the water begins to exit through the sprayhead. When this occurs, press the Stop switch. At this point the water tank is primed.

7.Turn off the power switch to energize the heating element.

8.When the water temperature has reached the preset temperature the Water Hot lamp will illuminate. This may take between 15 and 35 minutes.

9.Check the brewer water temperature at the sprayhead. If the temperature needs to be adjusted, refer to Adjustments section of this manual for instructions.

Use Control Functions

Power Switch: Controls the power to the heating element for the water tank.

Start Switch: Press to start a brew cycle.

Stop Switch: Pressing this switch during a brew cycle stops the cycle prematurely. Note: After the switch is pressed, adequate time must be given to drain the brew basket before removing from the unit.

!CAUTION: HOT LIQUID HAZARD

TEA BASKET CONTAINS VERY HOT LIQUID UNTIL THE DRIP-THROUGH IS COMPLETED. EARLY REMOVAL OF THE BASKET COULD RESULT IN BURNS.

Hot Water Light: Light illuminates when the water reaches the proper brewing temperature.

American Metal Ware® Tea Brewers

Page 4

Page 5
Image 5
Grindmaster TEA-300 Electrical Requirements cont, Initial Start-Up, Use Control Functions, Warning Electric Shock Hazard