Grizzly G0508 owner manual

Models: G0508

1 44
Download 44 pages 34.79 Kb
Page 15
Image 15

5.Attach the supporting legs to the housing bracket with 516"-18 x 12" flange bolts.

6.Position the base on top of the supporting legs (see Figure 8).

Flange Bolts

Figure 8. Base attached to supporting leg.

7.Fasten the supporting legs to the base with 516"-18 x 12" flange bolts.

8.With assistance, turn the entire assembly over so that the casters rest on the floor.

9.Position and hold the rubber gasket against the square opening in the main housing (see Figure 9).

Main Housing

Collector

Mounting Bolts

Rubber Gasket

Figure 9. Collector mounted to main housing.

10.With assistance, position and hold the collec- tor so the holes in the collector flange match with those of the rubber gasket and main housing.

11.Insert and hand tighten one 516"-18 x 1" flange bolt, two 516" flat washers, and one 516"- 18 hex nut in all eight holes.

12.Tighten the eight flange bolts and nuts in a alternating fashion so that the rubber gasket is evenly compressed without deformation.

13.Repeat Steps 10–13for the remaining col- lectors.

14.Place the inlet on the top center circular flange of the main housing (see Figure 10).

Screw

Figure 10. Inlet mounted on main housing.

15.Rotate the inlet so the hole in the inlet aligns with the hole in the housing flange.

16.Use the M6-1 x 10 Phillips head screw to fas- ten the inlet securely to the housing flange.

G0508 10 HP Industrial Dust Collector

-13-

Page 15
Image 15
Grizzly G0508 owner manual