Site Considerations
Floor Load
Refer to the Machine Data Sheet on Page 3 for the weight and footprint specifications of your machine. Some floors may require additional reinforcement to support both the machine and operator.
Placement Location
Consider existing and anticipated needs, size of material to be processed through each machine, and space for auxiliary stands, work tables or other machinery when establishing a location for your new machine. See Figure 5 for the minimum working clearances.
���
���������
��� ���������
Figure 5. Model G0508 illustrated top view and
suggested clearances.
Assembly
To the dust collector system:
1.Place the base upside down on the floor.
2.Attach the casters with the (16)
Caster
Caster Mounting
Figure 6. Caster mounted on base.
3.With assistance, place the main housing on the floor so that the motor is pointing up.
4.Place the end of the supporting leg with the threaded holes on the inside of the housing bracket (see Figure 7).
Flange Bolts
Figure 7. Supporting leg mounted to main
housing.
G0508 10 HP Industrial Dust Collector |