Site Considerations

Floor Load

Refer to the Machine Data Sheet on Page 3 for the weight and footprint specifications of your machine. Some floors may require additional reinforcement to support both the machine and operator.

Placement Location

Consider existing and anticipated needs, size of material to be processed through each machine, and space for auxiliary stands, work tables or other machinery when establishing a location for your new machine. See Figure 5 for the minimum working clearances.

���

���������

��� ���������

Figure 5. Model G0508 illustrated top view and

suggested clearances.

Assembly

To the dust collector system:

1.Place the base upside down on the floor.

2.Attach the casters with the (16) 516"-18 x 12" flange bolts (see Figure 6).

Caster

Caster Mounting

Figure 6. Caster mounted on base.

3.With assistance, place the main housing on the floor so that the motor is pointing up.

4.Place the end of the supporting leg with the threaded holes on the inside of the housing bracket (see Figure 7).

Flange Bolts

Figure 7. Supporting leg mounted to main

housing.