GSI Outdoors PNEG-214 installation manual Grain Systems Formed Flashing Installation

Models: PNEG-214

1 38
Download 38 pages 4.25 Kb
Page 12
Image 12
4. Flashing Installation

4. Flashing Installation

Figure 4A

Grain Systems Formed Flashing Installation

If a bin sweep auger will be used, overlap flashing so that the sweep with climb up on to the next flashing section when rotating (usually clockwise). (See Figure 4A.) This will prevent the rotating/slipping outer wheel of the sweep from catching on the flashing edges. (All GSI power sweeps and carry-in sweeps manufactured after April 2002 run clockwise.)

After floor is in place, place 1-1/4" bolts through pre-punched holes in sidewall. Bolt heads should be on outside of bin. See Figure 4B to determine the correct sequence for placing the nuts and washers. Finger tighten the nuts until all flashing is installed, then go back and fully tighten. While holding the flashing flat and pushing in towards the bin wall, fasten the flashing to the floor with two sheet metal screws.

12

Figure 4B

PNEG-21412'-18' Cor-Lok and Cut-Lok Flooring

Page 12
Image 12
GSI Outdoors PNEG-214 installation manual Grain Systems Formed Flashing Installation