GSI Outdoors PNEG-214 installation manual Recommended Method for Full Floor Installation, B

Models: PNEG-214

1 38
Download 38 pages 4.25 Kb
Page 9
Image 9
Chalked lines referred to Step 2

2. Recommended Method for Full Floor Installation

Grain Systems Recommended Method for Full Floor Installation

Using the GSI recommended method for full floor installation should save construction time and eliminate the problem of improper installation which could invalidate your warranty. Note the following dimensions as shown in Figure 2B.

Dimension “A” is the leg-to-leg spacing along the centerline of a given plank.

Dimension “B” is the amount of stagger between supports under adjacent planks and is half of Dimension “A”.

Dimension “C” is the distance from the center of the unload auger to the nearest rows of supports and is half of Dimension “B”.

Dimensions “A”, “B” and “C” are shown on the appropriate grandstand layout for wall heights under

32 feet. For taller bins, grandstand quantity as well as dimensions “A” and “B” are given on Page 27 and Page 28 for 20 gauge.

1.Layout centerlines of tank. Make sure one centerline is in line with the direction of the flooring planks while the other centerline is perpendicular with the flooring planks. See Figure 2B.

2.From the centerline that is perpendicular to the flooring planks, measure the distance of “C” Dimension and mark a chalk line. See Figure 2B.

3.From the line chalked in the previous step, measure over the distance of “B” Dimension and chalk another line. Repeat this procedure across the bin until reaching the wall in both directions. When completed, there should be a set of parallel lines (perpendicular to the floor planks) with “B” Dimension distance between each line. See Figure 2B.

Chalked lines referred to Step 2

Figure 2B

PNEG-21412'-18' Cor-Lok and Cut-Lok Flooring

9

Page 9
Image 9
GSI Outdoors PNEG-214 installation manual Recommended Method for Full Floor Installation, B, Chalked lines referred to Step