HEATER OPERATION | Deluxe Vane Axial Heater |
Standard Heater
Operation
1.Thermostat must be wired into heater control box for heater to operate.
2.Open all manual shutoff valves to heater unit.
3.Start fan. This will supply power to heater.
4.Turn thermostat dial to its highest setting.
5.Turn toggle switch on.
6.Heater should now be lit. If not check to see that all gas is on.
7.Watch thermometer on plenum and when it reaches desired temperature turn thermostat back slowly until heater cycles off.
8.Gas pressure should be adjusted so burner is on 75% of the time.
9.Watch plenum temperature as burner goes through a few cycles, to be sure that it is operat- ing properly.
Hi-Lo Heater
Operation
1.
2.Open all manual shutoff valves to heater unit.
3.Start fan. This will supply power to heater.
4.Turn thermostat dial to its highest setting.
5.Turn toggle switch on. Both red lights should light up indicating power to the control circuit.
6.Heater should now be lit. If not check to see that all gas is on.
7.Open
8.Turn thermostat dial back slowly until heater cycles to low flame.
9.Adjust ball valve so that
10.Turn thermostat dial to desired setting and wait for bin plenum to come up to temperature. Heater should cycle to low flame after a few minutes. If heater does not cycle to low flame increase
11.
12.Watch as burner goes through a few cycles, to be sure that it is operating properly, back to high flame.
16