INSTALLATION | Deluxe Vane Axial Heater |
Bin Configuration
IMPORTANT! When mounting (2) heaters on a bin it is imperative that they be situated as in above drawing. Plenum thermostat must be to the right of master heater and master heater must be to the right of slave heater.
Transition Hi-limit Installation
1. Mark location on transition one
(1) foot up from the bottom (entrance collar) and centered in the transition.
2. Drill or knock out 7/8" diameter hole on marked location.
3. Install transition
Figure 3: The transition connecting the Vane Axial Heater to the bin with
the plenum sensor in place.