Emerson Process Management Rosemount 2410 manual Mechanical Installation, Pipe Mounting, Bracket

Models: Rosemount 2410

1 144
Download 144 pages 24.51 Kb
Page 29
Image 29
3.3MECHANICAL INSTALLATION

Reference Manual

300530EN, Rev BA September 2012

Rosemount 2410

3.3MECHANICAL INSTALLATION

The Rosemount 2410 is designed for mounting on a pipe stand or on a wall.

NOTE!

Ensure that the 2410 is installed to minimize vibration and mechanical shock.

3.3.1Pipe Mounting

1 - 2 inches 3.3.1Pipe Mounting

Bracket

4 nuts and washers

1.Attach the bracket to the pipe.

2.Ensure that the 2410 is placed in a direction so that the display is clearly visible and wiring can be properly connected.

3.Tighten the nuts. Use moderate torque to ensure that the bracket does not break.

4.Attach the 2410 to the bracket by sliding it from the top downwards.

1 - 2 inches Bracket

5. Secure the 2410 to the bracket by tightening the screw.

Section 3. Installation

3-3

Page 29
Image 29
Emerson Process Management Rosemount 2410 Mechanical Installation, Pipe Mounting, Reference Manual, 1 - 2 inches Bracket