Installation Manual For Indoor Unit

3.Preparation before installation

(1)The position relation among hoisting screw (unit: mm)

360

250

Down side

890

600

794

AD242AHBEA

AD28NAHBEA

 

 

 

 

 

 

 

Up side

 

 

 

 

 

 

750

 

 

 

 

 

360

250

Down side

Up side

1270

853

1103

794

AD36NAHBEA

AD42NAHBEA

AD52NAHBEA

(2) If necessary, cut the opening installation and checking needed on the ceiling. (If has ceiling)

Before installation, finish the preparation work of all the pipes (refrigerant, drainage) and wire (wire controller connection wire, indoor and outdoor unit connection wire) of indoor unit, so that after installation, they can be immediately connected with outdoor unit.

Cut the opening on the ceiling. Maybe it needs to strengthen the ceiling to keep the ceiling even and flat and prevent the ceiling from vibration. For details, please consult to the builder.

(3) Hanger bolts installation

Use care of the piping direction when the unit is installed.

(Use M10 screw bolt)

In order to bear the weight of the unit, for existed

Hole-in anchor

Hole-in plug

ceiling, using foundation screw bolt, for new ceiling,

 

 

 

 

 

 

using burying embedded screw bolt, burying screw

 

 

 

bolt or spot supplied other parts.

 

 

 

 

 

 

Before going on installation, adjust the gaps with ceiling.

Hanging bolt M10

Insert

Concrete

14

Page 15
Image 15
Haier AD242AHBEA, AD28NAHBEA instruction manual AD36NAHBEA AD42NAHBEA AD52NAHBEA, Preparation before installation