Installation Manual For Indoor Unit
(d)When constructing drain piping for several units, position the common pipe about 100 mm below the drain outlet of each unit as shown in the sketch. Use
(e)The stiff PVC pipe put indoor side should be heat insulated.
Secure the elevation as high as possible (approx. 100 mm)
A downhill grade of | VP 30 |
1/100 or more |
|
(f)Avoid putting the outlet of drain hose in the places with irritant gas generated. Do not insert the drain hose directly into drainage, where the gas with sulfur may be generated.
(g)Backwater bend
Because the drain spout is at the position, which negative pressure may occur. So with the rise of water level in the drain pan, water leakage may occur. In order to prevent water leakage, we designed a backwater bend.
The structure of backwater bend should be able to be cleaned. As the below figure shown, use T type joint. The backwater bend is set near the air conditioner.
As figure shown, set a backwater bend in the middle of drain hose.
H1 |
H2 |
Drainage Test
H1=100mm or the static pressure of air sending motor H2=1/2H1 (or between 50~100mm)
1Conduct a drainage test after completion of the electrical work.
2During the trial, make sure that drain flows properly through the piping and that no water leaks from connections.
3 In case of a new building, conduct the test before it is furnished with the ceiling. 4 Be sure to conduct this test even when the unit is installed in the heating season.
Procedures
1Supply about 1000 cc of water to the unit through the air outlet using a feed water pump.
2Check the drain while cooling operation.
6.Installation of air suction and discharging duct
muffler cavity (air sending) | Enlarging chart of | |
|
| |
| Sacking joint | profile chart A |
Insulation | A | Vibration resistance hook |
Air volume adjuster | ||
Air outlet | Air conditioner | Ceiling |
main unit | Air suction grille with air filter | |
| Checking meatus |
Please consult the
16