Installation Procedure

(2) Cut an opening in ceiling for installation if necessary. (when ceiling already exists.)

Refer to paper pattern for dimension of ceiling hole.

Connect all pipings (refrigerant, water drainage), wirings (inter unit cable) to indoor unit, before installation. Cut a hole in ceiling, may be a frame should be used to ensure a smooth surface and to prevent vibration. Contact your real estate dealer

(3)Install a suspending bolt. (Use a M10 bolt)

To support the unit weight, anchor bolt shall be used in the case of already exists ceiling. For new ceiling, use built-in type bolt or parts prepared in the field.

Before going on installing adjust space between ceiling.

<Installation example>

Anchor bolt

50~150

Roof

Long nut

Suspending bolt

Ceiling

Note: All the above mentioned parts shall be prepared in field.

4Installation of indoor unit

In the case of new ceiling

(1) Install unit temporarily

Put suspending bracket on the suspending bolt. Be sure to use nut and washer at both ends of the bracket.

(2) As for the dimensions of ceiling hole, see paper pattern. Ask your real estate dealer for details.

Center of the hole is marked on the paper pattern.

Center of the unit is marked on the card in the unit and on the paper pattern.

Mount paper pattern 5 onto unit using 3 screws 6 . Fix the corner of the drain pan at piping outlet.

< After installation on the ceiling >

(3)Adjust unit to its right position. (Refer to preparation for the installation-(1))

(4)Check unit's horizontal level.

Watert pump and flating switch is installed inside indoor unit, check four corners of the unit for its level using horizontal compartor or PVC tube with water. (If unit is tilting against the direction of water drainage, problem may occur on floating switch, causing water leakage.)

(5)

Remove the washer mounlting 2 , and tighten the nut above.

 

(6)

Remove the paper pattern.

Nut (Prepare in field)

 

 

 

 

 

 

Washer (Prepared in field)

In the case of ceiling already exists

 

 

 

 

 

 

2

(1) Install unit temporarily

 

Put suspending bracket on the suspending bolt.

Be sure to use nut and washer at both ends

of the bracket. Fix the bracket firmly.

Suspending bolts

(2) Adjust the height and position of the unit.

 

(Refer to preparation for the installation (1) ).

Fasten (double nuts)

(3) Proceed with (3) and (4) of "In the case of new ceiling".

18

Page 20
Image 20
Haier HBU-18HF03, HBU-18CF03 installation manual Installation of indoor unit, After installation on the ceiling