Haier HDU-42CF03/H Installation Manual For Indoor Unit, Preparation before installation

Models: HDU-42CF03/H

1 34
Download 34 pages 5.12 Kb
Page 26
Image 26
3.Preparation before installation

Manual background Installation Manual For Indoor Unit

3.Preparation before installation

(1)The position relation among hoisting screw (unit: mm)

360

250

Down side

Up side

1270

853

1103

794

(2) If necessary, cut the opening installation and checking needed on the ceiling. (If has ceiling)

Manual background Before installation, finish the preparation work of all the pipes (refrigerant, drainage) and wire (wire controller connection wire, indoor and outdoor unit connection wire) of indoor unit, so that after installation, they can be immediately connected with outdoor unit.

Manual background Cut the opening on the ceiling. Maybe it needs to strengthen the ceiling to keep the ceiling even and flat and prevent the ceiling from vibration. For details, please consult to the builder.

(3) Hanger bolts installation

Manual background Use care of the piping direction when the unit is installed.

(Use M10 screw bolt)

In order to bear the weight of the unit, for existed

Hole-in anchor

Hole-in plug

ceiling, using foundation screw bolt, for new ceiling,

 

 

 

 

 

 

using burying embedded screw bolt, burying screw

 

 

 

bolt or spot supplied other parts.

 

 

 

 

 

 

Before going on installation, adjust the gaps with ceiling.

Hanging bolt M10 Manual background

Insert

Concrete

25

Page 26
Image 26
Haier HDU-42CF03/H installation manual Installation Manual For Indoor Unit, Preparation before installation