Cord Clamp/Ground Wire Installation
Step 1: As viewed from the inside, insert one SCREW (#20) through the right side of the CORD CLAMP (#19) and the inside of the TANK (#1). Make sure CORD CLAMP is covering the cord of the PUMP (#6).
Step 2: On the outside of the TANK, put both ground wires (green with 
Step 3: Leave the other side of the CORD CLAMP unattached for now.
Switch Box Wiring and Installation
Step 1: Make sure the black and white wires from the POWER CORD (#17) are hooked up to the bottom terminals as shown in Figure 2.
Step 2: Connect the black and white wires from the PUMP (#6) to the top terminals in the same fashion as the ones from the POWER CORD as shown in Figure 2.
  | White  | 
  | Wire  | 
  | Black  | 
  | Wire  | 
Power Cord  | Ground  | 
#17  | (goes to tank)  | 
  | Figure 2 — Wiring Switch Box | 