Harbor Freight Tools 41209 Operating the Nailer, To Adjust The Shingle Gauge

Models: 41209

1 14
Download 14 pages 20.97 Kb
Page 9
Image 9

3.Place a coil of nails (not included) around the Magazine Post (95) in the Magazine (92).

4.Uncoil enough nails to reach the Feed Pawl (61). Place the second nail on the coil between the teeth of the Feed Pawl, making sure the nail head fits in the slot in the upper portion of the Feed Pawl.

5.Swing the Magazine Cover (101) closed. Then, close the Door (80). Make sure the Door closes securely. If it does not engage, the nail head is not in the slot in the upper portion of the Feed Pawl (61).

To Adjust The Shingle Gauge:

1.The Gauge (87) controls roof shingle spacing. To adjust the Gauge to work with a particular width of shingles, use the accessory Hex Wrench (103) to loosen the Screw (84) on the Gauge. Slide the Gauge forward or backward to the desired spacing. Then, retighten the Screw.

BOTTOM

VIEW

GAUGE (87)

SHINGLE SPACING

SCREW

 

(84)

Operating the Nailer

1.Attach the Nailer to the air supply at the Air Plug (17). Start your compressor and check the pressure making sure it is set at the recommended 65-100 PSI and not to go over the maximum 100 PSI.

2.To fire, place the nose of the Nailer on the workpiece. The Nailer should not fire if the nose is not depressed. Once depressed, gently and briefly squeeze the Trigger (42) once. WARNING: Do not fire repeatedly. Nails could bounce off of one another, damaging the workpiece or causing PERSONAL INJURY.

SKU 41209

For technical questions, please call 1-800-444-3353.

Page 9

Page 9
Image 9
Harbor Freight Tools 41209 operating instructions Operating the Nailer, To Adjust The Shingle Gauge