
Installing the Insert (continued)
WARNING: MAJOR U.S. BUILDING CODES
!SPECIFY MINIMUM CHIMNEY AND/OR VENT HEIGHT ABOVE THE ROOF TOP. THESE MINIMUM HEIGHTS ARE NECESSARY IN THE INTEREST OF SAFETY. SEE THE FOLLOWING DIAGRAM FOR MINIMUM HEIGHTS, PROVIDED THE TERMINATION CAP IS AT LEAST
Note: This also pertains to vertical vent systems installed on the outside of the building.
Installation de la cassette (suite)
AVERTISSEMENT : LES PRINCIPAUX CODES DE
!CONSTRUCTION AMÉRICAINS DÉFINISSENT LA HAUTEUR MINIMALE DE LA CHEMINÉE ET/OU DU CONDUIT D’ÉVACUATION
Remarque : Ces restrictions s’appliquent également aux systèmes d’évacuation verticale installés à l’extérieur de l’édifice.
|
| HORIZONTAL OVERHANG |
|
| (SURPLOMB) |
| 2 FT (61cm) | VERTICAL WALL |
2 FT | MINI. | |
(61cm) |
| (MUR VERTICAL) |
MINI. |
| LOWEST |
|
| |
|
| DISCHARGE |
|
| OPENING |
|
| (L’OUVERTURE |
|
| D’ÉVACUATION LA |
TERMINATION CAP |
| PLUS BASSE) |
|
| |
(CAPUCHON) |
|
|
|
| X |
|
| 12 |
|
| ROOF PITCH IS X/ 12 |
|
| (LA PENTE DU TOIT EST DE X/12) |
|
| H (MINI.) - MINIMUM HEIGHT FROM ROOF |
|
| TO LOWEST DISCHARGE OPENING |
|
| (H (MINI) - HAUTEUR MINIMUM ENTRE LE TOIT |
|
| ET L’OUVERTURE D’ÉVACUATION LA PLUS BASSE) |
ROOF PITCH | H (MIN.) FT. |
Flat to 6/12 | 1.0 |
6/12 to 7/12 | 1.25 |
Over 7/12 to 8/12 | 1.5 |
Over 8/12 to 9/12 | 2.0 |
Over 9/12 to 10/12 | 2.5 |
Over 10/12 to 11/12 | 3.25 |
Over 11/12 to 12/12 | 4.0 |
Over 12/12 to 14/12 | 5.0 |
Over 14/12 to 16/12 | 6.0 |
Over 16/12 to 18/12 | 7.0 |
Over 18/12 to 20/12 | 7.5 |
Over 20/12 to 21/12 | 8.0 |
PENTE DU TOIT | H (MINI.) EN CM |
De plat à 6/12 | 30 |
De 6/12 à 7/12 | 38 |
De 7/12 à 8/12 | 46 |
De 8/12 à 9/12 | 61 |
De 9/12 à 10/12 | 76 |
De 10/12 à 11/12 | 99 |
De 11/12 à 12/12 | 122 |
De 12/12 à 14/12 | 152 |
De 14/12 à 16/12 | 183 |
De 16/12 à 18/12 | 213 |
De 18/12 à 20/12 | 229 |
De 20/12 à 21/12 | 244 |
Figure 3. Minimum height from roof to lowest discharge opening
Figure 3. Hauteur minimum entre le toit et l’ouverture d’évacuation la plus basse
18