Install pendant light to
Junction Box
1.Push wires into the junction box.
2.Remove
3.Slide canopy onto canopy screws and tighten knurled canopy nuts securely against the canopy. Note: Canopy should fit tight against mounting surface.
Canopy Screw
Testing
1.Turn on the circuit breaker and light switch.
Note: Sensor has a 1 1/2 minute warm up period before it will detect motion. When first turned on wait 1 1/2 minutes.
2.To remove sensor cover, unscrew the 4 sen- sor cover screws holding the sensor cover on bottom of light fixture.
Knurled |
|
Canopy Nut | Canopy |
Bulb installation and
replacement
Sensor
Sensor Cover
Nut
Sensor Cover
1. | Slide door latch up to unlock door. Pull latch to |
| open door. |
2. | Install two candelabra base light bulbs (60 |
| Watts maximum each). |
3. | After installing bulbs, close door and slide latch |
3.
down to securely lock door. |
DUAL | BRITE |
| ||
|
| K | ||
|
|
| DUS WN | |
| 3 | 6 | TO DA | |
OFF |
|
| ||
|
|
| N | |
|
|
| 10 MI |
|
| 1 | 5IME |
| |
|
|
Sensor
Lens
DualBrite®
DUSK
OFF 3HR 6HR TO DAWN
TEST 1 5 10 MIN
ON-TIME
Lift Latch Up | Open Door |
4.Walk through the coverage area noting where you are when the lights turn on. In TEST mode, light will stay on for only 5 seconds then turn off.