Final Assembly

1.Push the wires into the junction box. Make sure none of the wires get pinched.

2.Slidethefixture assemblyontothemountingscrews. Tighten decorative nuts removed in step 1 of Instal- lation section securely against fixture base.

Finial

 

Top Cover

Decorative Nut

 

Star Washer

Nut

Decorative Nut

Mounting Screw

Junction Box

3 Light Bulbs

 

(60 Watt

Fixture

Maximum each)

Assembly

 

3.Caulk around fixture base with silicone weather sealant.

4.Install the three LED Lamps (Lights of America Model No. 2025LEDE12 included). Note: This fixture’s E12 candelabra base uses either LED Lamps (1.5W maximum each) or tungsten in- candescent Type “B” bulbs (60 Watt maximum each).

5.Insert threaded rod of finial through top cover.Slide star washer onto rod and thread the nut onto the rod. Tighten securely.

6.Place top cover onto fixture and attach using the two decorative nuts (included). Hand tighten only.

4

598-1338-03

Page 4
Image 4
Heath Zenith 9600LED series warranty Final Assembly