B. Install Fireplace & Chimney

B. Install Fireplace & Chimney

D. Install Termination Cap

Install as per Sections 7 and 8.

Install the chimney sections up through the chase enclo- sure.

C. Install Chase Top

You MUST use a chase top in a chase installation. Chase tops are available from your Heatilator dealer or may be field constructed.

Include a turndown and drip edge to prevent water from seeping into the chase.

Include a 2 in. (51 mm) soldered, welded or spun collar around pipe opening to keep water out.

Provide a 1/8 in. (3 mm) gap around the flue pipe.

Slope the chase top downward away from the opening.

Warning! Risk of Fire! Do not caulk the pipe to the chase top collar.

Caulk all seams to prevent leaks.

Refer to Figure 9.3.

• Caulk the overlap seam of any exposed pipe sections that are located above the roof line to prevent leaks.

Refer to termination cap instructions.

Warning! Risk of Fire! The minimum overlap of

cap to pipe (as shown in the following illustrations) MUST be met or chimney may separate from cap. Separation allows sparks, heat and embers to escape.

Notice: Paint the termination cap with a rust-resistant paint to protect against the effects of corrosion on those parts exposed to the weather.

TR344 Round Termination Cap

Termination

Cap

Slope Downward (1/4 in. per foot minimum)

2 in. (51 mm) Collar on Chase Top

D. Install Termination Cap Turn-down

C. Install Chase Top Drip Edge

•Warning! Risk of Fire! The minimum overlap of Chase

.018 (26 ga) min. Galvanized Chase Top

Slip

storm collar

around chimney pipe

before termination cap pipe is snapped into the chimney pipe.

Caulk gaps between

Storm

storm collar & pipe,

Collar

and storm collar

 

& chase top.

 

Collar

 

2 in. (51 mm)

Chimney

Minimum Height

Pipe

 

Chase Top

 

Do NOT

block air holes

6 in. (153 mm) Minimum top of chase to top of chimney pipe

Figure 9.3 Chase Top Construction

Chase

Termination cap pipe and chimney section must be snapped together to maintain an overlap of 1-1/2 in. (38 mm).

Figure 9.4 Installing a TR344 Round Termination Cap