COMMISSIONING | BURNER FEATURES |
FILLING THE HOT WATER AND HEATING CIRCUITS
IMPORTANT
Hot water tank must be pressurised before the heating circuit is filled.
1.Close the primary circuit filling valves (A and B)
2.Open the stop valve (1) and the
3.Fill the primary (heating) circuit by opening the valves (A and B) and pressurising to 1 bar.
| A |
| B |
|
| 2 | 6 |
|
| 8 | |
|
|
| |
1 | 3 |
| 7 |
2 |
| ||
|
|
| 10 |
|
| 4 | 11 |
|
| 5 | |
|
|
|
ACV BG
Description and operating method:
The BG
The gas tube is covered with a metal fibre (NIT), which, in addition to its outstanding
The main parts are a venturi and a valve, a unit developed specially by Honeywell for low NOx air/gas premix burners with automatic ignition and flame detection by ionisation.
The pressure at the gas valve outlet is equal to the air pressure in the neck of the venturi, less the offset. The fan sucks combustion air through the venturi, into which the gas inlet emerges.
As it passes through, the air produces a pressure differential in the constriction of the venturi and sucks the gas into the venturi outlet. A perfect mix of air and gas then passes through the fan to the burner tube.
This design ensures very quiet and safe operation:
•If there is an air blockage, the pressure differential in the venturi falls, the gas flow diminshes, the flame goes out and the gas valve closes: the burner is in safety shutdown mode.
•If there is a blockage in the chimney outlet, the air flow diminishes, and the same reactions as those described above cause the burner to shut down in safety mode.
•The BG
The BG
Air/gas mixture control system
Venturi Fan
9 |
4.Open the automatic air vent located on top of the boiler.
IMPORTANT - the screw cap must be left loose to allow future automatic venting to take place.
5.After venting the air from the system, bring the pressure up to the static head plus 0.5 bar: 1.5 bar = 10 m and 2 bar = 15 m.
6.Check that the electrical connection and boiler room ventilation conform to the relevant standards.
7.Switch the on/off switch to the ON position.
8.Set the temperature values (see page 17).
9.Check the gas supply pressure (see page 13).
10.When the burner is on, check that the flue gas discharge pipes are completely gas tight.
11.After operating for five minutes, turn off the boiler and drain the heating circuit again, maintaining a pressure of 1 bar.
12.Turn the appliance back on and check the combustion (see page 13).
Air
Offset adjuster screw
Gas
Air/gas mixture
Gas flow adjuster
screw
12