2-10. HEATING

Model OFE-321,322

2-10. HEATING

Checkout (Power Supplied)

CONTACTORS

 

(Continued)

 

To avoid electrical shock, make connections before applying power, take reading, and remove power before removing meter leads. The following checks are performed with the wall circuit breaker closed and the main power switch in the ON position.

1.Re-apply power to unit and turn POWER switch ON.

2.Using illustrations from previous page, check voltage as follows:

Test Points

Results

From terminal 34 to 35

The voltage should read

From terminal 35 to 36

the same at each terminal

From terminal 34 to 36

 

Replacement:

If either contactor is defective it must be replaced as follows:

To avoid electrical shock or property damage, move the POWER switch to OFF and disconnect main circuit breaker, or unplug cord at wall receptacle, to the frypot to be worked on. Be aware the other controls will have power.

1.Remove only the wires directly connected to the contactor being replaced. Label the wires for replacement.

2.Loosen the screws securing the contactor bracket to the shroud.

3.Remove the contactor from the bracket.

4.Reinstall in reverse order.

2-9

405

Page 9
Image 9
Henny Penny OFE-321 manual Heating, Checkout Power Supplied, Contactors, Continued, Replacement