English

OPERATION

APPLICATIONS

Demolishing concrete, chiseling concrete, grooving, bar cutting, and driving piles. Application examples:

Installation of piping and wiring, sanitary facility installation, machinery installation, water supply and drainage work, interior jobs, harbor facilities and other civil engineering work.

PRIOR TO OPERATION

1.Power source

Ensure that the power source to be utilized conforms to the power source requirements specified on the product nameplate.

2.Power switch

Ensure that the switch is in the OFF position. If the plug is connected to a receptacle while the switch is in the ON position, the power tool will start operating immediately and can cause serious injury.

3.Extension cord

When the work area is far away from the power source, use an extension cord of sufficient thickness and rated capacity. The extension cord should be kept as short as practicable.

WARNING: Damaged cord must be replaced or repaired.

4.Check the receptacle

If the receptacle only loosely accepts the plug, the receptacle must be repaired. Contact a licensed electrician to make appropriate repairs.

If such a fautly receptacle is used, it may cause overheating, resulting in a serious hazard.

5.Confirming condition of the environment:

Confirm that the work site is placed under appropriate conditions conforming to prescribed precautions.

12

Page 12
Image 12
Hitachi H 45MR instruction manual Applications, Prior to Operation