– 16 –FORM 33906 Rev. C (Mar. 2000) PRINTED IN U.S.A.
DATE ______________________
DAY / SHIFT TIME PREWASH TANK
TEMPERATURE WASH TANK
TEMPERATURE POWER RINSE TANK
TEMPERATURE FINAL RINSE
TEMPERATURE COMMENTS /
RECORDED BY