Hobart HFB12 ML-114906, HFB12 ML-114909 manual Electrical Data, Start-Uptesting, Lamp Test

Models: HFB12 ML-114909 HFB12 ML-114906

1 23
Download 23 pages 23.42 Kb
Page 6
Image 6
ELECTRICAL DATA

"Stinger" Location

Ground

Ground

Receptacle START-UP TESTING

PL-52644

3 PHASE 240 VOLT RECEPTACLE

Fig. 2

ELECTRICAL DATA

 

 

 

 

Max.

Max.

Typical

Typical

Breaker

NEMA

Model

Voltage

Phase

Cycles

Recepta-

Power

Current

Power

Current

Size

 

 

 

 

cle

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HFB12

208/240

1

60

11.9 kW

56 A

9 kW

43 A

60 A

14-60R

 

 

 

 

 

 

 

 

 

 

HFB12

208/240

3

60

11.9 kW

35 A

9 kW

27 A

40 A*

15-50

 

 

 

 

 

 

 

 

 

 

*50A if cord connected.

START-UP TESTING

After the oven is connected to the supply circuit, perform the following tests to ensure that the oven is operating properly.

Lamp Test

Turn the oven on by pressing the ON/OFF button. After a few seconds, the display will settle on Recipe 1. At this point, hold down the 1 button and push the 8 button at the same time. The display will appear as follows:

Would You Like To

Check The Lamps

1 = Yes

2 = No

– 6 –

Page 6
Image 6
Hobart HFB12 ML-114906, HFB12 ML-114909 manual Electrical Data, Start-Uptesting, Lamp Test